“The use of the MHED modular system as installed has added a future proofing concept to our structural infrastructure in the OR here at St. Cloud Hospital. The versatility this product brings has made it possible to cut the downtime in the OR remodeling in less than half. In our case, this is big money for our surgery operation. Where we used to recognize downtimes of 2-3 months per OR, we can now do in as little as 30 days. We are very impressed with the product and are excited about the savings in downtime we have virtually eliminated for future projects.”
David Larson
Director, Facility Management
Modified an existing Ortho OR that had been design using the modular system into a Hybrid OR re-using the same materials in less than 7 days.